Ready-mix concrete typically costs about $125 to $180 per cubic yard for a full truckload in 2026. Small orders cost much more per yard once short-load and delivery fees are added.
Estimate your ready-mix order
How much is a yard of concrete?
2026 cost guides put standard ready-mix at roughly $125 to $180 per cubic yard for a full truckload, with planning averages around $150. Producers that publish price lists show a standard 3,000 PSI mix in the high $120s to high $140s per yard before delivery and fees. Higher-strength mixes, fiber, color, accelerators for cold weather and retarders for hot weather all cost extra.
That price is for the concrete only. Placing and finishing it is a separate labor cost, as are forms, base, reinforcement and pumping. For the installed cost of a finished slab, see the concrete slab cost calculator.
Short-load fees: why small orders cost more
A mixer truck carries about 8 to 10 cubic yards. When you order less, the plant still has to send the truck and driver, so it adds a short-load fee. Fees vary a lot by supplier. Many guides report about $40 to $60 extra per cubic yard on orders under a full load, while others charge a flat fee per order. Fuel, environmental and weekend surcharges and waiting time beyond the free unloading period are billed on top.
Worked example: a 2.5-yard patio
At $150 a yard the concrete is $375. A $50-per-yard short-load surcharge adds $125 and $75 of delivery and fuel fees brings the total to $575, an effective $230 per yard. The same $150 concrete ordered as a full 10-yard load with the same $75 fee works out to $157.50 per yard. Enter your supplier's numbers in the estimator above.
Cost by order size
| Order | Typical concrete cost (at $125–$180/yd) | Notes |
|---|---|---|
| 1 yard | $125–$180, often $250+ with fees | Small orders can cost more in fees than concrete |
| 3 yards | $375–$540 + short-load fees | Around a typical plant minimum |
| 5 yards | $625–$900 + short-load fees | A 20 × 20 ft slab at 4 in is about 5 yards with extra |
| 10 yards | $1,250–$1,800 | Usually a full truck; no short-load fee |
Ways to pay less per yard
- Ask about the minimum. If the plant's minimum is 3 or 4 yards, ordering the minimum may cost little more than a smaller order.
- Combine pours. Pour a walkway and a pad on the same day, or share a truck with a neighbor.
- Be ready. Have forms, tools and helpers ready so the truck is not charged for waiting.
- Compare options for tiny jobs. For under about a yard, bags or a towable mixer trailer from a rental yard may be cheaper. 45 bags of 80 lb concrete make one cubic yard.
- Order the right amount. Running short means a second delivery, often with a second short-load fee. Use the concrete calculator and add 5–10%.
What changes the price of concrete
- Strength (PSI): 2,500–3,000 PSI is common for patios; driveways and structural work often call for 3,500–4,000 PSI or more.
- Distance: many plants charge mileage beyond a set radius.
- Season and day: Saturday delivery and winter additives cost more.
- Pumping: when a truck cannot reach the pour, a pump truck adds a significant fee.
Frequently asked questions
How much does a yard of concrete cost in 2026?
About $125 to $180 per cubic yard for standard ready-mix in a full load, before short-load and delivery fees.
What is a short-load fee for concrete?
An extra charge when you order less than a full truck, often about $40 to $60 per yard or a flat fee per order. Ask your supplier for its minimum and policy.
How much does a full truck of concrete cost?
A 10-yard load at $125 to $180 per yard is about $1,250 to $1,800 for the concrete, plus any delivery fees.
Is it cheaper to buy bags or ready-mix?
For less than about a yard, bags or a rental mixer trailer are often cheaper. Above that, ready-mix usually wins on both cost and labor.
Sources
- LatestCost: Concrete cost per yard in the U.S. 2026
- SimplyWise: Concrete cost per yard in 2026 (posted producer price lists)
- Bob Vila: How much does concrete cost per yard?
- Lawn Love: Concrete cost (2026)