Road Base & Gravel Driveway Calculator
A good gravel driveway or building pad is built in layers. Enter the size and each layer's depth and stone to get tons per layer, total tons and the number of truckloads.
Calculate driveway layers
Why build a driveway in layers?
A gravel driveway that is just a few inches of stone on soil turns into ruts and potholes. A durable one is built like a road: a layer of larger stone at the bottom spreads the load and drains water, a compacted layer of road base (crusher run) above it forms a hard, stable platform, and a thin surface layer gives a clean finish that is comfortable to drive on. Each layer is compacted before the next goes on.
| Layer | Typical stone | Typical depth | Job |
|---|---|---|---|
| Sub-base | #3 or similar 1.5–2.5 in stone | 4–6 in | Spreads load, drains, bridges soft soil |
| Base | Road base / crusher run | 4–6 in | Hard, compacted platform |
| Surface | #57, smaller crushed stone or road base | 2–3 in | Driving surface, refreshed every few years |
On firm, well-drained soil you may skip the sub-base. On clay or wet ground, a woven geotextile fabric under the first layer stops the stone sinking into the soil and is often the single best upgrade you can make.
Worked example: a 50 × 12 ft driveway
With 4 inches of #3 stone, 4 inches of road base and 2 inches of #57 surface stone, each layer with 15% added for compaction: the sub-base is about 11.9 tons, the base about 12.4 tons and the surface about 6 tons, for about 30.2 tons in total. At 14 tons per dump-truck load that is 3 loads.
What is road base?
Road base is a dense-graded crushed aggregate, stone from about 3/4 or 1 inch down to dust, that compacts into a hard layer. In many areas it is the same product as crusher run, and it is also sold as Class 2 or Class 5 base, ABC, CA-6, 21A or flex base, depending on the state specification. It typically weighs about 1.4 to 1.5 tons per cubic yard; the calculator uses 1.45.
Building tips
- Strip topsoil and organic material first. Stone placed on topsoil will sink.
- Crown the driveway so the center is a little higher than the edges, and give water a place to go with ditches or culverts.
- Compact each layer in lifts of a few inches with a plate compactor or roller, with the stone slightly damp.
- Ask how many tons the supplier's trucks carry. Tandem dump trucks commonly carry somewhere around 10 to 15 tons, and larger trucks more.
For a single layer of any stone, use the stone calculator.
Frequently asked questions
How much road base do I need for a driveway?
For a 50 × 12 ft driveway, a 4-inch compacted layer of road base is about 12.4 tons. A full three-layer driveway is roughly 30 tons.
How thick should a gravel driveway be?
Commonly 8 to 12 inches in total, built in two or three compacted layers.
How many tons is a dump truck load of gravel?
Often about 10 to 15 tons for a tandem dump truck, but it varies by truck and state weight limits; ask your supplier.
Is road base the same as crusher run?
Often, yes. Both are dense-graded crushed stone with fines that compact hard; local names and specifications differ.
Sources
- Hello Gravel: road base product specifications
- Select Sand & Gravel: How much does a yard of crushed stone weigh?