Concrete Slab Calculator
Plan a whole slab in one go: the concrete to order, the gravel base under it, the form boards around it and the rebar inside it.
Calculate your slab
What this slab calculator includes
A general concrete calculator only tells you volume. A slab is a small construction project, so this one also works out the parts people forget to order:
- Concrete in cubic yards with a waste allowance, the number of 80 lb bags if you mix it yourself, and how many full 10-yard trucks that is.
- Gravel base under the slab, with 15% added because crushed base compacts. Most slabs sit on 4 to 6 inches of compacted crushed stone.
- Form boards: the perimeter in linear feet.
- Rebar: total length of #4 bar for a grid in both directions at your chosen spacing, and the number of 20-foot bars. Add about 10% for laps where bars overlap.
rebar length = (bars across the width × length) + (bars across the length × width)
Worked example: a 20 × 20 ft patio or garage slab
At 4 inches thick the slab is 4.94 cubic yards, or 5.43 with 10% extra. That is 245 bags of 80 lb concrete, which is why almost everyone orders ready-mix for a slab this size. A 4-inch compacted gravel base needs about 5.7 cubic yards, roughly 8.2 tons. A #4 rebar grid at 18 inches on center is about 560 linear feet, or 28 twenty-foot bars before laps. The forms are 80 linear feet.
Worked example: a 30 × 40 ft shop slab, 6 inches thick
1,200 sq ft × 0.5 ft = 600 cubic feet, or 22.2 cubic yards. With 10% extra that is about 24.4 yards: two full 10-yard trucks plus a partial load. Pours this size are usually placed by a crew with a pump or with trucks backing to each side, and they need careful planning so each load arrives before the last one starts to set.
Recommended slab thickness
| Use | Typical thickness | Notes |
|---|---|---|
| Patio, walkway, shed floor | 4 in | Wire mesh or fibers are common |
| Garage for cars | 4–5 in | Often with thickened edges |
| Driveway | 4–6 in | 6 in where trucks or RVs park |
| Shop or metal building | 5–6 in | Rebar, thickened edges and anchor bolts per the building plans |
| Heavy equipment, lifts | 6–8 in or more | Follow the equipment maker's requirements |
A slab that supports a building is structural. Local codes and the building manufacturer's foundation drawings set the thickness, edge depth, reinforcement and vapor barrier, and a permit and inspection are usually required.
Rebar or wire mesh?
Welded wire mesh controls shrinkage cracks in thin slabs such as patios, but it only works if it stays in the middle of the slab rather than being trodden to the bottom. Rebar on chairs is stiffer and holds cracked sections together, which is why it is usual for driveways, garages and shop slabs. Neither replaces a well-compacted base and proper control joints, which are usually cut at intervals of about 2 to 3 times the slab thickness in feet (for a 4-inch slab, every 8 to 12 feet).
Before you pour
- Compact the base in layers and check it is flat. Low spots in the base become extra concrete.
- Set forms to the finished height and check the slope: about ⅛ to ¼ inch per foot away from buildings for outdoor slabs.
- Call your local utility-locating service (811 in the US) before digging.
- Book a crew. Placing and finishing a few yards of concrete is hard, fast work.
For the cost of having a slab poured, see the concrete slab cost calculator.
Frequently asked questions
How many yards of concrete do I need for a 20x20 slab?
4.94 cubic yards at 4 inches thick, or about 5.4 yards with 10% extra. At 6 inches it is 7.4 yards, or about 8.1 with extra.
How much gravel do I need under a concrete slab?
Typically 4 to 6 inches of compacted crushed stone. For a 20 × 20 slab, 4 inches is about 8 tons once compaction is allowed for.
How far apart should rebar be in a slab?
12 to 18 inches on center in both directions is common for driveways and garage slabs, but follow your plans or local code.
How many bags of concrete for a 10x10 slab?
At 4 inches with 10% extra, about 62 bags of 80 lb concrete.